AID2E bi-weekly technical meeting
Meeting: October 16, 2025
Attendees: Not recorded in the source notes.
- Recap of plans for the paper
- W&M and JLab were working on ePIC utilities for combined optimization.
- CUA was working on the forward tracker and could begin using
scheduler_epic for integration.
- BNL was preparing computational-study figures.
- W&M was combining dRICH, Central Tracker, and Far-Forward into a single workflow.
- Task list
- CUA to provide instructions for their optimization workflow.
- W&M to provide central-tracker instructions.
- Duke to provide dRICH-MOBO instructions.
- JLab and W&M to provide ePIC utilities.
- W&M to work on the three-subdetector combined workflow.
- BNL to run optimization using PanDA.
- W&M to run SLURM-based examples.
- Updates
- BNL:
- Working on the PanDA worker wrapper to report metrics such as start time, end time, and other attributes.
- Investigating Sobol initialization and the number of simulated events needed for convergence.
- Discussed PanDA token lifetime.
- CUA: update slides
- JLab: Derek was on vacation that week.
- AOB