AID2E bi-weekly technical meeting
Meeting: November 13, 2025
Attendees: Not recorded in the source notes.
- Announcements: none.
- PI Exchange preparation
- Closure Test 2 stress-test figures were requested for various runners, objectives, and design dimensions.
- Generation and fit time from Ax should be extracted from JSON outputs and plotted.
- Detector-optimization updates included:
- dRICH-MOBO (Duke): slides
- dRICH-MOBO (BNL): Fang summary here and Amit slides here
- CLAS12 (Duke): slides
- KLM (Duke): slides and paper
- B0 optimization (CUA): Baptiste shared progress by Zoom chat and planned figures later.
- Central Tracker: slides
- Closure Test 2 with all runners: slides
- Path toward publication was postponed.